Raw material: PPGI GI PPGL
Raw material width:1200mm
Effective width:1000 mm
Raw material thickness: 0.3-0.8mm
$10,000.00
Raw material: PPGI GI PPGL
Raw material width:1200mm
Effective width:1000 mm
Raw material thickness: 0.3-0.8mm
Working flow:
Decoiler—Feeding material into machine—Forming—Measure length—Hydraulic cutting—Finish product
Parameters:
Raw material | |
Material | colored steel sheet, galvanized steel sheet, aluminum sheet |
Thickness of coil sheet | 0.3-0.8 mm |
Material expand width | 1200mm |
Efficiency width | 1000 mm |
Machine details | |
Roller material | high grade NO. 45 forged steel with 0.05mm hard chrome plating |
Shaft material | high grade NO. 45 carbon wrought steel |
Cutting blade | Cr12 mould steel with quenched treatment |
Diameter of shaft | 70mm or as your requirement |
Main frame | 300 H steel |
Forming steps | 14 stations |
Productivity | 25m/min |
Hydraulic station power | 4KW |
Hydraulic pressure | 10-12MPa |
Appearance size | 6800mm*1200mm*1250mm |
Hydraulic oil | 40# hydraulic oil |
Electric tension | 380V 50 Hz 3 Phase or as your requirement |
Cut Mode | Hydraulic forming after cutting off |
Electronic control system | PLC, Touch Screen, Encoding counter |
Payment Term
– 30% by TT in advance
– 70% is paid before the shipment by TT
Delivery Time
Within 30 days after receiving deposit.
Packing Method
Main machine is packaged with plastic film
Transportation
A:We have professional technicians for loading ,Guaranteed the goods load into container without any damage.
B:Transportation : Machines need one 20/40 feet container to hold
Warranty
A: Guaranteed against malfunctions due to manufacturing defects for 1.0 year after date of purchase. Space parts will be made free of charge,but freight cost should be paid by buyer.
B: Space parts will not be performed even during the guarantee period in the follow circumstances
– Damage occurs due to a natural disaster
– Malfunction occurs due to user error
– Malfunction occurs due to modifications
– Malfunction occurs due to further movement or shipment after installation
Commissioning:
One technician for seven working days from seller to buyer’s side for the instruction of installation and commissioning as well training. An English-Chinese interpreter will be send by seller in case of the buyer asks. All the expenses of them including local transportation, food, laundry and accommodation in buyer’s country and visa,international tickets will be on the buyer side. The hotel shall be equivalent or better than the level of a Chinese 3 star hotel. The buyer shall provide each person USD 100 per day as pocket money.
Our Customers:
FAQ
Q: Are you manufacturer?
A: Yes, we are manufacturer and trading company.
Q: What kind of payment term you can do?
A: We are flexible about payment terms, please contact us for details.
Q: What info you need before you make the proposal for a roll forming machine?
A: The profile drawings, material information, your special requirements.
Q: What I should do if I just start to know roll forming machinery?
A: Contact us immediately, we provide free consultant pre-sales service.
Q: How to visit our company:
A: 1.Fly to Beijing airport: By high speed train From Beijing Nan to Cangzhou Xi (1 hour),then we can pick up you.
2.Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours),then we can pick up you.
3. Fly to Guangzhou airport: By air From Guangzhou to Beijing airport; By high speed train From Beijing Nan to Cangzhou Xi (1 hour),then we can pick up you.
Contact Us