///Roller Shutter Production Line With Factory Price

Roller Shutter Production Line With Factory Price

$8,000.00

Raw material: PPGI GI PPGL

Raw material width: 160mm

Effective width:112mm

Raw material thickness: 0.5-1.2mm

Product Description

Working flow:

Decoiler—Feeding material into machine—Forming—Measure length—Hydraulic cutting—Finish product

 

 

 

 

Parameters:

Raw material
material colored steel sheet, galvanized steel sheet, aluminum sheet
thickness of coil sheet 0.5-1.2mm
material expand width 160mm
Efficiency width 112mm
Machine details
roller material high grade NO. 45 forged steel with 0.05mm hard chrome plating
shaft material high grade NO. 45 carbon wrought steel
cutting blade Cr12 mould steel with quenched treatment
diameter of shaft 60mm or as your requirement
main frame square tube welded
forming steps 10  stations
productivity 12-15m/min
hydraulic station power 5.5KW
hydraulic pressure 10-12MPa
appearance size 4500mm*600mm*1200mm
hydraulic oil 40# hydraulic oil
Electric tension 380V 50 Hz 3 Phase or as your requirement
Cut Mode Hydraulic forming after cutting off
Electronic control system PLC, Touch Screen, Encoding counter

Payment Term

– 30% by TT in advance

– 70% is paid before the shipment by TT

Delivery Time

Within 30 days after receiving deposit.

Packing Method

Main machine is packaged with plastic film

Transportation

A:We have professional technicians for loading

Guaranteed the goods load into container without any damage.

B:Transportation : Machines need one 20/40 feet container to hold

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Warranty

A: Guaranteed against malfunctions due to manufacturing defects for 1.0 year after date of purchase. Space parts will be made free of charge,but freight cost should be paid by buyer.

B: Space parts will not be performed even during the guarantee period in the follow circumstances

–  Damage occurs due to a natural disaster

–  Malfunction occurs due to user error

–  Malfunction occurs due to modifications

–  Malfunction occurs due to further movement or shipment after installation

Commissioning: 

One technician for seven working days from seller to buyer’s side for the instruction of installation and commissioning as well training. An English-Chinese interpreter will be send by seller in case of the buyer asks. All the expenses of them including local transportation, food, laundry and accommodation in buyer’s country and visa,international tickets will be on the buyer side. The hotel shall be equivalent or better than the level of a Chinese 3 star hotel. The buyer shall provide each person USD 100 per day as pocket money.

Our Customers

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FAQ

Q: Are you manufacturer?

A: Yes, we are manufacturer and trading company.

 

Q: What kind of payment term you can do?

A: We are flexible about payment terms, please contact us for details.

 

Q: What info you need before you make the proposal for a roll forming machine?

A: The profile drawings, material information, your special requirements.

 

Q: What I should do if I just start to know roll forming machinery?

A: Contact us immediately, we provide free consultant pre-sales service.

 

Q: How to visit our company:

A: 1.Fly to Beijing airport:   By high speed train From Beijing Nan to Cangzhou Xi (1 hour),then we can pick up you.

2.Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao  to Cangzhou Xi(4.5 hours),then we can pick up you.

3. Fly to Guangzhou airport: By air From Guangzhou to Beijing airport; By high speed train From Beijing Nan to Cangzhou Xi (1 hour),then we can pick up you.

 

Contact Us

WhatsApp/WeChat:+8615297387252

Email: anna@hyrollforming.com

 

 

    Your Name (required)

    Your Email (required)

    Your Message